Construction activities:
References
Project: | Office Building (Huisman Konstrukce) |
---|---|
Location: | Sviadnov, Frýdek-Místek |
Description: | General construction. This is a three-floor office building, covered area of aprox.1000m2, load-bearing construction – reinforced concrete skeleton, based on reinforced concrete footing, sheathing with wall panels. Part of the office building is also the car-park accommodating approximately 80 cars. It is connected with drainage system and oil separator. |
Carried out by: | Building division 1 |
Project: | ASMO |
---|---|
Location: | Zruč nad Sázavou |
Description: | Delivery and installation of facade and roof including the skylights. |
Carried out by: | Building division 1 |
Project: | A-TEC servis s.r.o. |
---|---|
Location: | Frýdek-Místek |
Description: | General delivery of this construction- preparation works, digging, foundation structures, brick plinth, floors, steel constructions, locksmith works, roof and facade. |
Carried out by: | Building division 2 |
Project: | Car showroom and car repair garage ADO OSTRAVA a.s. |
---|---|
Location: | Ostrava |
Description: | Complete reconstruction of the facade, installation of the aluminium wall including the fitting of laminated window louvre system. Extension of workshop, bricked vertical load-bearing structure, horizontal load-bearing structure of steel trusses. |
Carried out by: | Building division 1 |
Project: | Bomar, spol. s.r.o. |
---|---|
Location: | Brno |
Description: | Delivery and fitting the facade cladding and roof cladding |
Carried out by: | Building division 2 |
Project: | Briggs and stratton power products, s.r.o. |
---|---|
Location: | Ostrava |
Description: | Delivery and fitting trapezoidal metal sheets and external cladding. |
Carried out by: | Building division 2 |
Project: | D8P Project Five s.r.o. |
---|---|
Location: | Klecany - Středočeský kraj |
Description: | Delivery and fitting the roof cladding including trapezoidal metal sheets and external cladding. |
Carried out by: | Building division 2 |
Project: | Daikin |
---|---|
Location: | Brno, Plzeň |
Description: | Delivery and fitting the facade cladding and roof cladding including skylights. Conveyor belt. |
Carried out by: | Building division 1 |
Project: | DHL Supply Chain,s.r.o. |
---|---|
Location: | Pohořenice, Jižní Morava |
Description: | Delivery and fitting the facade cladding. |
Carried out by: | Building division 2 |
Project: | GRA Estate s.r.o. |
---|---|
Location: | Kunice u Prahy |
Description: | Delivery and fitting the roof cladding including trapezoidal metal sheets of exterior. |
Carried out by: | Building division 2 |
Project: | Huisman Konstrukce Preparation workshop hall |
---|---|
Location: | Frýdek-Místek |
Description: | General construction of the hall. A complex reconstruction of the current two-level building with dimension of the ground plan 48x40m, height 11m and extension of a single-level of dimensions 38x18m. There has been an overall reconstruction of the facade cladding, and newly installed skylights in the roof. The hall has been newly equipped with air handling units. The heating is powered by gas-fired infrared radiators. |
Carried out by: | Building division 1 |
Project: | Integrated Security Centre MSK Integrated Security Centre |
---|---|
Location: | Ostrava |
Description: | This delivery consisted of the steel load-bearing construction and superstructure of the 5th and 6th floor, in-building three-floor complex in the atrium in the existing building and designer construction of a ring-shaped facade and roof “boomerang“. Ceiling construction was designed as coupled steel reinforced concrete panel. Special welded steel mandrels were used for the coupling. |
Carried out by: | Building division 1 |
Project: | Crane rails |
---|---|
Location: | Frýdek-Místek |
Description: | General delivery of the crane rail of dimensions 174,8x10,8m. It consists of two longitudinal reinforced concrete foundational belts of width 800mm joined by reinforced rod of dimension 600mm. The Rail track is anchored on the axis of the longitudinal foundations. |
Carried out by: | Building division 1 |
Project: | K+ Vítězná s.r.o. |
---|---|
Location: | Ostrava |
Description: | Delivery and fitting the facade facing system "O-FACE". |
Carried out by: | Building division 2 |
Project: | Kiekert - CS, s.r.o. |
---|---|
Location: | Pohořelice, Jižní Morava |
Description: | Delivery and fitting the complete facade cladding. |
Carried out by: | Building division 2 |
Project: | Kompakt Invest a.s. |
---|---|
Location: | Prostějov |
Description: | Delivery and fitting the roof cladding including trapezoidal metal sheets, external cladding. |
Carried out by: | Building division 2 |
Project: | Regional Court of Law |
---|---|
Location: | Olomouc |
Description: | Delivery and fitting steel wall panels of dimensions 24m height x70m length, including two staircase towers. The wall is sheeted with architectural aluminium sunshades and glass panels. |
Carried out by: | Building division 1 |
Project: | Coating workshop |
---|---|
Location: | Frýdek-Místek |
Description: | General delivery of extension of the coating workshop including the office space with dimensions of the ground plan 48x20m. The load-bearing steel construction is equipped with two cranes with the lifting capacity of 20t. Part of the delivery was also the reinforced concrete floor drainage system. The entrance is a door gate of dimensions 6x7m. Future extension up to 12x7m is possible due to dismounting the central column. |
Carried out by: | Building division 1 |
Project: | MIKO international s.r.o. |
---|---|
Location: | Frýdek-Místek |
Description: | Delivery and fitting roof and external cladding, skylights and aluminium facade. |
Carried out by: | Building division 2 |
Project: | Assembly workshop Huisman Konstrukce |
---|---|
Location: | Sviadnov, Frýdek-Místek |
Description: | General delivery of the assembly workshop. It is a two-level building with ground plan dimensions 44x88m and hight 20,7m. The workshop is equipped with cranes (lifting load 40t and 60t). The main entrance is a section door gate of dimension 8.7x7.3m. The hall is cladded with a cassette facade system. Positioning is based in tiered reinforced nibs. The floor is wire reinforced concrete with load bearing capacity of 15t/m2. Parts of the assembly workshop were also outdoor concrete areas and roofing of the corridor. |
Carried out by: | Building division 1 |
Project: | Muramoto |
---|---|
Location: | Žebrák |
Description: | Delivery and fitting the facade cladding and the roof cladding, skylights including supporting steel structures. |
Carried out by: | Building division 1 |
Project: | Optimont |
---|---|
Location: | Hnojník |
Description: | We provided the panel cladding of some of the existing buildings and some of the newly built buildings. |
Carried out by: | Building division 1 |
Project: | Plakor |
---|---|
Location: | Mošnov |
Description: | Complete delivery of the facade cladding and the roof of the production plant. The facade cladding is a panel system with the fiberglass wool filling or alternatively PUR, in accordance with the fire and safety instructions. Roof cladding is composed of trapezoidal metal sheets are the load bearers, followed by heat insulation fiberglass and polystyrene. Bituminous membrane sheets are used as a waterproofing system. Other works included construction of loading platform 140x8m, extension of stock hall (approximately 3100m2xh 9m, and 4 pieces of fireproof door gates were installed, fire resistance standard EI30DP1. |
Carried out by: | Building division 1 |
Project: | Solar Turbines EAME s.r.o. |
---|---|
Location: | Žatec |
Description: | Delivery and fitting the complete facade cladding and skylights. |
Carried out by: | Building division 2 |
Project: | Sungwoo |
---|---|
Location: | Ostrava |
Description: | Delivery and fitting the complete facade and roof cladding and skylights. |
Carried out by: | Building division 1 |
Project: | UNIS COOL s.r.o. |
---|---|
Location: | Staré Město (okr. Frýdek-Místek) |
Description: | Reconstruction of the workshop hall |
Carried out by: | Building division 2 |
Project: | Vysoké učení technické Brno |
---|---|
Location: | Brno |
Description: | Delivery and fitting sandwich panels cladding, aluminium facade shutters and facade „COTREN“ pre-rusted metal sheets. |
Carried out by: | Building division 2 |