References:
References - projects
Project: | Extension and ecologization of PO OK in Huisman Construction Ltd. |
---|---|
Location: | Sviadnov, Moravskoslezský Kraj |
Character of the building: | Extension of the paint shop |
Description: | Degrees of prepared documentation: studies DUR, DSP, DRS, DSPS. This project was developed as a general delivery and we managed the coordination of all professions at all levels of documentation. Documentation addressed the extension of the existing paint shop in the production area of Huisman Construction in Sviadnov. This extension has increased and improved working and handling space required for the growing production of the company. The existing hall of the paint shop was on a surface area of 688 m2 and has been expanded to southeast by approximately 976 m2. It was a one-floor insulated building based on reinforced concrete footing and belts. The supporting structure is made of steel columns and Skillion roof made of steel trusses. The new hall of the paint shop is the dimensions of 48.80 x 24.68 x 12.5 / or 4, 80 m, while in an area of approximately 48.80 x 19.85 x 12.5 meters is a new paint shop hall,, lower part measuring 30,145 x 4.76 x 4.80 m extension of the paint shop hall is now warehouse. In the northeast part in front of the paint shop is located a steel platform using technological disposal of VOC substances with dimensions w.9, 50 x l.15, 525 x h.8, 13 m in the new part of the hall are two overhead cranes with capacity of 2x10t with crane runway at 7,850 m above the floor. |
Carried Out By: | Building Division 1 |
Project: | Plakor - PLAKOR III. phase (Warehouse + loading ramp) |
---|---|
Location: | Mošnov, Moravskoslezský Kraj |
Character of the building: | Expansion of production hall |
Description: | Degrees of prepared documentation: studies DUR, DSP, tender documentation, DRS. This project was developed as a general delivery and we managed the coordination of all professions at all levels of documentation. Documentation solves extension of a new warehouse and a loading ramp for production hall PLAKOR. Extension of warehouse is functionally linked to the existing hall (Press shop) on the west side of the building. For communications between the two spaces are used gates and doors (due to the FR with fire protection strength). Extension of warehouse is a single level building on a ground plan with dimensions of 24 x 133 m. Extension height is +9.10 m Passing height under the concrete trusses is 6,4 m Skillion roof is with a slope of 5%. As the roofing material is applied the bitumen strip roof will be insulated for reasons of fire resistance. Built-up area of hall extension is 3.102 m2. Extension of warehouse is cladded by polyurethane wall panels of thickness 80 mm in RAL 9006. Part of cladding are 3 pieces of sectional gates with dimensions of 5000/4500 1 piece with dimension of 3000/3000 and 4 pieces of doors with dimensions of 900 /, 1970. Natural lighting in the warehouse space is provided by 11 pieces of polycarbonate skylights with dimensions 3000x6000 mm. For the extraction of exhaust fumes from trucks trading to the warehouse, a mobile extraction unit vented into the coat of facade. Extension of a loading ramp is connected to the existing loading area on the south side of the building. Loading ramp runs along the entire length of the facade of warehouse in a length of 138 m. The ramp is about 10.8 meters wide. All structures are reinforced concrete. Taxiways surface and ramp are a mixture of ABS. |
Carried Out By: | Building Division 1 |
Project: | ADO Ostrava – Assembly hall of showroom ADO |
---|---|
Location: | Ostrava-Přívoz, Hlučínská ul., Moravskoslezský Kraj |
Character of the building: | Showroom, garage |
Description: | Degrees of prepared documentation: studies DUR, DSP, DRS This project was developed as a general delivery and we managed the coordination of all professions at all levels of documentation. In the new hall are the garages. The operation mainly consists of installing six electric jacks and other common garage equipment including high pressure air distribution for hand tools (clamps , drills, etc.), laser geometry, and space for cleaning vehicles. It is a single-storey, without cellar construction of an assembly hall on a rectangular floor plan, covered with a gabled roof with roof skylights. The slope of the roof planes is 10 °. The building has plan dimensions of 32.17 x 20.60 m Eaves height is 4.2 m and in ridge height is 6.1 meters above the surrounding ground. Facade of the building is a thin silicate plaster in white color. The roof is made of PE film gray colour. Exterior doors and windows are made of plastic in white color RAL 9002. |
Carried Out By: | Building Division 1 |
Project: | The New Assembly Hall |
---|---|
Location: | Sviadnov, Moravskoslezský Kraj |
Character of the building: | Assembly hall of engineering products |
Description: | On this project we worked together with the office of Tebodin, based on their documentation DSP. We finalized the project into phases of design documentation, supporting steel structure of hall we prepared as a general delivery. It is an assembly hall, parking for cars and expansion of the existing access road within premises of Huisman Design, Ltd. Hall is used for installation of steel structures. The hall is designed as a single-level, the dimensions 44.22 x 87.82 m, height is 21 meters. In the hall, continues a new roof between the existing 5-halls and a new assembly hall. Given that the existing facades of buildings are decorated in light shades, the new hall is designed with cladding from pleated casing (C-cassette, insulation, trapezodial metal sheet ) RAL 9006 and RAL 7035. If operation and fire safety allows it, facades are fitted with aluminum windows, plastic windows (roof light). |
Carried Out By: | Building Division 1 |